Jobsite Safety & Environmental (OSHA)
13% of this examBusiness & Finance tests safety the way an employer lives it: running a safety program, keeping and posting the OSHA injury records, reporting serious injuries on time, handling an inspection and a citation, hazard communication, and employee rights. OSHA 29 CFR 1926 is not on the Business & Finance reference list — jobsite measurements (trench depths, guardrail heights) belong to the Project Management exam.
What the exam asks
- Whether an injury is recordable, and when it must be logged, reported, posted and kept.
- The 8-hour and 24-hour reporting clocks, and what a small employer still has to report.
- How an inspection runs, how citations are classified, and the 15 working days to contest.
- Who gets cited on a multi-employer site, and who inspects under the safety program.
- Environmental and drug-free workplace rules a contractor meets on site.
Part 1 of 4
Running the safety program
The employer owns safety on the job. This part covers who inspects, how hazards are ranked and controlled, and the rights employees have when they speak up.
Running the safety program
The contractor must run a program with frequent and regular inspections by competent persons it designates. A competent person can spot hazards and has authority to correct them; a qualified person has the education or experience to solve the problem. Controls rank from elimination and engineering, through administrative controls, to PPE last. A job hazard analysis lists a task's steps, the hazard at each, and the control. Where no clinic or hospital is reasonably close, someone with a valid first-aid certificate must be on site. OSHA's On-Site Consultation Program is free and confidential, and its findings are not shared with enforcement.
Employees have protected rights
Employers may not retaliate for reporting an injury or filing a safety complaint; an OSH Act 11(c) complaint must be filed within 30 days. Required PPE is the employer's cost, and HazCom requires a written program, labeled containers, accessible SDSs, and training.
Part 2 of 4
Recordkeeping and reporting
Most of the numbers in this lesson sit here. First decide whether a case is recordable, then know the calendar for logging, reporting, posting and keeping it.
What makes a case recordable
A work-related injury goes on the 300 Log when it results in death, days away from work, restricted work or job transfer, medical treatment beyond first aid, or loss of consciousness. OSHA's first-aid list is complete: non-prescription medication at non-prescription strength, tetanus shots, cleaning and bandaging wounds, hot or cold therapy, non-rigid supports. Treatment on that list keeps a case off the log. An injury in the work environment is presumed work-related, with listed exceptions such as a personal errand off the premises or eating food brought from home.
Recordkeeping is a calendar
Recordable cases go on the 300 Log and a 301 Incident Report within 7 calendar days. The 300A summary is certified by a company executive and posted February 1 through April 30. Keep the log, summary, and 301s for 5 years after the end of the year they cover.
Counting days and special entries
Days away are calendar days, counted from the day after the injury whether or not the employee was scheduled, and counting may stop at 180. Certain cases are entered as a 'privacy case' in place of the name: injury to an intimate body part, sexual assault, mental illness, HIV, hepatitis, tuberculosis, needlesticks. The host employer that supervises a temp worker day to day records the case. Sites that will last less than a year can share one log kept at the main office.
Small doesn't mean silent
Companies with 10 or fewer employees all last year (peak, company-wide) skip the logs, and construction is not a partially exempt industry. Every employer still reports a fatality within 8 hours and an in-patient hospitalization, amputation, or eye loss within 24 hours.
Reporting details
A fatality is reportable if it occurs within 30 days of the incident, and the 8 hours run from when the employer learns of it. An in-patient hospitalization, amputation, or eye loss is reportable only if it occurs within 24 hours of the incident. In-patient hospitalization means formal admission for care or treatment; admission for observation or testing only is not reportable. Establishments with 20 to 249 employees in construction also submit their 300A data electronically by March 2.
Worked examples
- Hour 0Incident occurs
- +8 hoursFatality reported to OSHA
- +24 hoursIn-patient hospitalization, amputation, or loss of an eye reported
- +7 daysRecordable case entered on the 300 Log and 301 report
- Dec 31Year closes; review the 300 Log and build the 300A summary
- Feb 1Certified 300A posted where employee notices go
- Apr 30Posting period ends
- +5 yearsLog, summary, and 301s may be discarded
In your books: Recordkeeping and reporting live in 29 CFR Part 1904. Tab it.
Part 3 of 4
Inspections, citations and who gets cited
An inspection has a set order, and a citation starts a short clock. On a shared site, the general contractor can answer for a subcontractor's hazard.
Inspections and citations have rules
An employer may insist on a warrant. Citations are classified as willful, serious, other-than-serious, repeat, or failure-to-abate, and penalties weigh business size, gravity, good faith, and history. A contest must be filed within 15 working days, and fixing a hazard on the spot does not erase the citation.
The inspection, start to finish
OSHA's priorities run: imminent danger, then fatalities and catastrophes, then complaints and referrals, then programmed inspections. An inspection is an opening conference (credentials, purpose, scope), a walkaround, and a closing conference. Both the employer and the employees may have a representative on the walkaround. A citation is posted at or near the violation for 3 working days or until it is corrected, whichever is longer. Florida has no state plan, so federal OSHA covers private contractors here.
After a citation
Within the 15 working days to contest, the employer can ask for an informal conference with the area director, and the conference does not extend the 15 days. The notice of contest says whether it challenges the citation, the penalty, or both; miss the deadline and the citation becomes a final order. If the fix cannot be done by the abatement date for reasons outside the employer's control, file a Petition for Modification of Abatement. A serious violation is one with a substantial probability of death or serious harm that the employer knew or should have known about. Willful and repeat violations carry roughly ten times the serious maximum.
Who gets cited on a multi-employer site
OSHA recognizes four roles: the employer that created the hazard, the one whose workers are exposed, the one responsible for correcting it, and the controlling employer. A general contractor with supervisory authority over the site is a controlling employer and can be cited for a subcontractor's hazard it should have found with reasonable care. Where no specific standard applies, the General Duty Clause requires a workplace free of recognized hazards likely to cause death or serious harm.
Worked examples
- ArrivalCredentials shown
The employer may require a warrant
- Opening conferencePurpose and scope explained
- WalkaroundEmployer and employee representatives may accompany
- Closing conferenceApparent violations and abatement discussed
- Day 0Citation and proposed penalty received
Post it at or near the violation
- 3 working daysMinimum posting period
Or until abated, whichever is longer
- Any time before day 15Informal conference with the area director
Does not stop the clock
- 15 working daysNotice of contest must be postmarked
After that the citation is a final order
In your books: Inspections, citations and contests are in 29 CFR Part 1903, not Part 1904.
Part 4 of 4
Environmental and drug-free workplace rules
The outline's government regulations area adds the environmental laws a contractor meets on site. This part also covers the Florida drug-free workplace program and the site details of hazard communication and the stormwater permit.
Environmental rules ride along with safety
The outline's 'government regulations' area adds the environmental laws a contractor meets on site: NPDES stormwater coverage at one acre of disturbance (Florida DEP runs it), the EPA Lead RRP rule for pre-1978 housing, an asbestos survey plus 10 working days' notice before demolition, a Section 404 permit before filling wetlands, and Sunshine 811 two full business days before digging.
Florida drug-free workplace
A program that follows FS 440.102 (60-day notice, written policy, four required test types) qualifies the employer for a workers' comp premium discount and strengthens its position when denying benefits for drug- or alcohol-related injuries. Random testing is allowed but not required.
Hazard communication and environmental rules on site
The written HazCom program includes a list of the hazardous chemicals on site and, on a multi-employer site, how other employers get access to the SDSs. Secondary containers are labeled unless filled for immediate use by the worker who filled them. Under the stormwater permit the site keeps a SWPPP with its best management practices, washes out concrete trucks in a contained area, and stays covered until final stabilization. The Lead RRP rule requires a certified firm and a certified renovator on pre-1978 housing. A positive drug test under a drug-free workplace program is confirmed by a second method and reviewed by a medical review officer.
In your books: Drug-free workplace and workers' comp questions go to the FS 440 reprint in the Contractors Manual. Section 440.102 covers the program and 440.09 covers benefit denial.
Know these cold
The short list to have in your head on exam day. Every line is also a card in your flashcards.
- NPDES stormwater threshold
- 1 acre disturbed (or part of a larger common plan) — Clean Water Act / FDEP CGP
- Asbestos demolition notice
- Survey first; written notice at least 10 working days before demolition — 40 CFR 61 Subpart M
- Sunshine 811
- Call at least 2 full business days before excavating — FS 556
- Drug-free workplace credit
- 5% workers' comp premium credit — FS 627.0915
- Log + 301 entry
- Within 7 calendar days of learning of a recordable case — 1904.29
- Fatality / hospitalization reporting
- 8 hours / 24 hours (also amputation, eye loss) — 1904.39
- Form 300A posting
- Feb 1 – Apr 30, certified by a company executive — 1904.32
- Record retention
- 5 years after the end of the covered year — 1904.33
- Contesting a citation
- 15 working days from receipt — 1903.17
- Retaliation complaint (11(c))
- 30 days after the adverse action — 1977.15
- Drug-free workplace notice
- 60 days before testing starts — FS 440.102(3)
- Recordable
- Death, days away, restriction or transfer, treatment beyond first aid, loss of consciousness — 1904.7
- First aid
- OSHA's list is exhaustive; bandages and non-prescription medicine stay off the log
- Day count
- Calendar days from the day after the injury; may stop at 180
- Fatality window
- Reportable if within 30 days of the incident; 8 hours from learning of it
- Hospitalization window
- Reportable if within 24 hours of the incident; observation only is not
- Electronic 300A
- 20–249 employees in construction; due March 2 — 1904.41
- Inspection priorities
- Imminent danger, fatalities, complaints, programmed
- Citation posting
- 3 working days or until abated, whichever is longer — 1903.16
- Informal conference
- Inside the 15 working days; does not extend them
- PMA
- Petition for Modification of Abatement when the date cannot be met — 1903.14a
- Controlling employer
- A GC with site authority can be cited for subs' hazards
- General Duty Clause
- OSH Act Section 5(a)(1): recognized serious hazards with no specific standard
- Competent vs qualified
- Competent = recognizes hazards and has authority; qualified = education or experience
- Hierarchy of controls
- Elimination, engineering, administrative, PPE last
- Florida and OSHA
- No state plan; federal OSHA enforces
- Lead RRP
- Pre-1978 housing; certified firm and certified renovator — 40 CFR 745
Where it lives in your books
The real exam is open book. Knowing which book and which tab answer this topic is worth as much as memorizing it.
- Environmental Rules · 5 recommended tabsThese are concept-and-threshold questions, not lookup questions: one acre (NPDES), pre-1978 housing (lead RRP), 10 working days' notice (asbestos), two full business days (811). None of these texts is in the exam room.
- OSHA 1926 · 11 recommended tabsOSHA questions are number questions: heights, depths, distances, and hours. Tab the big subparts and trust the printed number over your memory.
- Workers' Comp (FS 440) · 4 recommended tabsThe construction industry rule is stricter than the general rule — coverage required with just one employee. Exemption questions hinge on the officer/ownership limits.
Reading isn't learning. Retrieval is.
63 questions in this domain, each with an explanation and source.