Site Work & Excavation
20% of this examEverything that happens before steel goes in: reading the plan and scale, staking and squaring the layout, running elevations from the benchmark, locating utilities and setbacks, judging the soil and water table, dewatering, digging safely under OSHA Subpart P, and backfilling and grading so the shell and deck stay put. The construction exams put roughly a fifth of their points here, and most of it is arithmetic and sequence.
What the exam asks
- Layout and elevation: reading the scale, proving a layout square, and finding an elevation from the benchmark.
- Before the dig: Sunshine 811, setbacks and easements, and what the soil and water table tell you.
- OSHA Subpart P numbers: 5 ft, 4 ft, 2 ft, 25 ft and the slope ratios by soil type.
- Earthwork math: square feet to square yards, cubic feet to cubic yards, and swell.
- Backfill, compaction percentage and finished grade.
Part 1 of 5
Layout and elevations
Everything is measured from something. Horizontal layout comes from the property lines and the plan, and vertical measurements all come from the benchmark.
Layout is geometry you can check
Read the scale off the title block (1/4 in. = 1 ft means 1 in. = 4 ft) and use written dimensions over scaled ones. Stake the pool from the property lines and setbacks, then prove the rectangle is square by measuring both diagonals — equal diagonals, square layout. Elevations come off the benchmark: height of instrument = benchmark + backsight rod reading, and a larger rod reading means lower ground.
Real length = Inches measured on the sheet × Feet per inch
Real length (use a written dimension when there is one)
8 in. × 4 ft equals 32 ft
Level and square by the numbers
Height of instrument is the benchmark elevation plus the backsight reading. Any point's elevation is the height of instrument minus the rod reading there, and a longer rod reading means lower ground. Bond beam, tile line and deck elevations all come off the benchmark. For square, four right side lengths can still be a parallelogram: measure both diagonals, or pull a 3-4-5 triangle at a corner.
Height of instrument = Benchmark + Backsight. Point elevation = Height of instrument − Rod reading
Height of instrument
100 ft + 4.20 ft equals 104.20 ft
Point elevation (a longer rod reading means lower ground)
Height of instrument − 5.70 ft equals 98.50 ft
Part 2 of 5
Before the dig: 811, setbacks and the soil
The expensive mistakes happen before the machine starts. Know where the utilities and setbacks are, and what the ground and the water table will do to the job.
Before the dig: 811, setbacks and the health department
Florida law requires notice to the one-call center, Sunshine 811, at least two full business days before digging so the utilities can mark their lines. Check the survey for zoning setbacks, recorded easements and septic setbacks; the water's edge and the deck or screen enclosure often have different setbacks. For a public pool, the Department of Health approves the plans before the building department issues the permit.
The site tells you how to dig
Call the one-call center (811) and wait for the marks before any digging. Check the water table (and the tide, near the coast): a high table means well points or a sump during construction and uplift protection afterward. Muck and organic soils will not carry a shell — remove and replace with compacted fill, or go to pilings per an engineer. Keep the excavation outside the zone of influence of an adjacent footing or have it shored.
Part 3 of 5
Digging safely under OSHA Subpart P
Subpart P is a list of numbers and a few plain rules. Learn the triggers, the slope by soil type, and who and what stays out of the hole and away from the machine.
OSHA Subpart P is the safety script
Excavations 5 ft or deeper need a protective system (sloping, benching, shoring or a shield) unless in stable rock; Type C soil slopes 1½:1. Spoil and equipment stay at least 2 ft back from the edge; a ladder, ramp or steps sits within 25 ft of lateral travel in trenches 4 ft or deeper; a competent person inspects daily and after rain. Stay out of the backhoe's swing radius and never under a raised bucket.
Protect the public, the crew and the neighbor's footing
An open excavation is fenced or barricaded so children and the public cannot reach it. Keep the dig out of the zone of soil that carries an adjacent footing's load, or the house can settle. Around machines, nobody stands in the swing radius or under a raised bucket, and a machine backing with a blocked view needs an alarm or a spotter. A trench ladder extends at least 3 feet above the top.
Worked example
- Type A0.75 ft out per 1 ft down
Cohesive, stable soil (53°)
- Type B1 ft out per 1 ft down
45°
- Type C1.5 ft out per 1 ft down
Sand and wet soil (34°). Most Florida pool sites.
In your books: Excavation safety numbers are straight lookups in 29 CFR 1926 Subpart P. Tab 1926.651 and 1926.652 and the soil-classification appendix.
Part 4 of 5
Wide, deep and wet: overdig, water and uplift
The hole is bigger than the shell on purpose, and the water in the ground wants the empty shell to float. Know the difference between planned overdig and a mistake, and when the pumps can stop.
Overdig on purpose, over-excavation by mistake
The hole is laid out wider than the shell line so the crew has room for forms, steel and plumbing, and deeper than the finished floor by the shell thickness. That planned overdig is backfilled later. Digging too deep by mistake is different: the shell must bear on undisturbed soil, so the low spot is corrected with fill compacted in lifts or with lean concrete. Never throw loose soil back in.
Dewatering and uplift
Well points are small screened pipes jetted in on close centers around the dig, tied to a header and a pump that lowers the water table below the floor. Drawdown is how far the pumping lowers the water. An empty shell is a boat: if groundwater rises against it before it has cured and has weight to hold it down, it can crack or float. Keep dewatering until the shell can resist uplift.
Part 5 of 5
Earthwork math, backfill and grade
Area and volume questions are unit conversions. Backfill and finished grade finish the job, and they are part of the structure.
Earthwork math is two conversions
Area: square feet ÷ 9 = square yards, so 60 × 45 ft of sod is 2,700 ÷ 9 = 300 square yards. Volume: cubic feet ÷ 27 = cubic yards, so a 30 × 16 × 5.5 ft hole is 2,640 ÷ 27 ≈ 97.8 cubic yards in the ground. Dug soil swells; sandy soil loads out at roughly 10 to 15% more volume, so hauling is priced on loose measure.
Square yards = Square feet ÷ 9
Area
60 ft × 45 ft equals 2,700 sq ft
Area in square yards (dividing by 3 is the classic mistake)
Area ÷ 9 equals 300 sq yd
Cubic yards = Cubic feet ÷ 27. Loose yards = Bank yards × (1 + Swell)
Volume
30 ft × 16 ft × 5.50 ft equals 2,640 cu ft
In the ground (bank measure)
Cubic feet ÷ 27 equals 97.8 cu yd
Loose measure for hauling (sandy soil swells roughly 10 to 15%)
Bank yards × (1 + 12%) equals 109.5 cu yd
Backfill and grade are part of the structure
Backfill in thin lifts, each compacted near optimum moisture, to the specified density — commonly 95% of the laboratory Proctor maximum, checked with a nuclear gauge or sand cone. Use free-draining material behind fiberglass and vinyl walls, filling the shell at the same rate. Finished grade slopes away from the pool and deck so runoff and lawn chemicals do not drain into the water.
Percent compaction = In-place dry density ÷ Proctor maximum dry density × 100
Percent compaction (compare it with the spec, commonly 95% of the Proctor maximum)
100 lb/cu ft ÷ 105 lb/cu ft equals 95.2%
In your books: Write the conversion before dividing. The wrong answers are built from the other conversions.
Know these cold
The short list to have in your head on exam day. Every line is also a card in your flashcards.
- Scale 1/4 in. = 1 ft
- 1 in. on the sheet = 4 ft; use written dimensions first, scale only to check
- Square layout
- Both diagonals equal; a 30 × 40 ft rectangle has 50 ft diagonals
- Height of instrument
- Benchmark elevation + backsight rod reading; elevation = HI − foresight
- OSHA excavation triggers
- Protective system at 5 ft; egress within 25 ft at 4 ft; spoil 2 ft back
- Soil slopes
- Type A ¾:1, Type B 1:1, Type C 1½:1 (34°)
- Compaction spec
- Commonly 95% of the Proctor maximum dry density, thin lifts, near optimum moisture
- Sunshine 811 notice
- At least two full business days before digging.
- Square yards
- Square feet ÷ 9 (2,700 sq ft = 300 sq yd). Dividing by 3 is the classic mistake.
- Cubic yards
- Cubic feet ÷ 27 (2,640 cu ft ≈ 97.8 cu yd).
- Swell
- Sandy soil loads out at roughly 10 to 15% more volume than it had in the ground. Haul on loose measure.
- Backfill lifts
- Thin layers, often 6 to 12 in., each compacted near optimum moisture.
- Percent compaction
- In-place dry density ÷ laboratory (Proctor) maximum dry density.
- Benchmark
- A stable point of known elevation; every vertical measurement on the job comes from it.
- Well points
- Screened pipes on close centers around the dig, on a header to a pump, lowering the water table below the floor.
- Over-excavation repair
- Fill compacted in lifts, or lean concrete. Never loose fill.
- Trench ladder
- Within 25 ft of travel at 4 ft deep, extending at least 3 ft above the top. A 60-ft trench needs at least two.
- Public pool plan approval
- Department of Health (Chapter 514, rule 64E-9) approves the plans before the building permit is issued.
- Muck and peat
- Compress and keep settling. Remove and replace with compacted fill, or carry the shell on pilings per an engineer.
Where it lives in your books
The real exam is open book. Knowing which book and which tab answer this topic is worth as much as memorizing it.
- OSHA 1926 · 11 recommended tabsOSHA questions are number questions: heights, depths, distances, and hours. Tab the big subparts and trust the printed number over your memory.
- Walker's · 4 recommended tabsTakeoff questions reduce to unit discipline: convert everything to the unit being priced (CY, SF, LF) before doing arithmetic. The 27 cubic feet per cubic yard conversion is the most-used number in the book.
- Pool References · 9 recommended tabsSafety and barrier questions are code lookups; hydraulics questions are formulas. Keep the formula sheet (turnover, volume, TDH) tabbed in the handbook and the barrier rules tabbed in the code.
Reading isn't learning. Retrieval is.
64 questions in this domain, each with an explanation and source.