Code & Wind Requirements
8% of this examFlorida's wind rules are what make this exam different from any other state's. Questions test the HVHZ boundaries, the product approval system, roof wind zones and why attachment tightens at edges, and the hurricane mitigation features — secondary water barriers, roof-to-wall retrofits, and the inspections that earn insurance credits.
What the exam asks
- Which products are allowed where: Florida Product Approval statewide, a Miami-Dade NOA in the HVHZ.
- Why corners and perimeters see the most uplift, and what the four design-pressure inputs are.
- How the load path, secondary water barriers and roof-to-wall retrofits keep a roof on the building.
- Reroofing triggers: the 25 percent rule and deck re-nailing.
Part 1 of 4
Approvals and where the HVHZ applies
Florida will not let you put a covering on a roof just because it looks right. The product needs an approval, and the install has to follow it. In Miami-Dade and Broward the bar is higher.
Approval first, installation per approval
Every covering must be an approved product — Florida Product Approval statewide, or a Miami-Dade NOA especially in the HVHZ (Miami-Dade and Broward counties only). The approval defines the tested assembly: materials, underlayment, fasteners, spacing, edge details. Keep the documents on site for the inspector, and remember reroofs need permits statewide.
HVHZ rules are their own chapter
Miami-Dade and Broward carry the state's strictest requirements — including more demanding prescriptive underlayment systems beyond statewide rules. Wind mitigation inspections document features (covering, deck attachment, roof-to-wall, roof shape, secondary water barrier) for insurance premium discounts; they do not replace building department inspections.
HVHZ: approval and ballast
A job in Broward or Miami-Dade follows the HVHZ sections of Chapter 15, and each product needs an approval that shows HVHZ compliance, commonly a Miami-Dade NOA. A statewide approval never evaluated against HVHZ criteria does not qualify. Loose-laid ballasted roofs are not allowed because the stone becomes missiles. Gravel or slag set in a flood coat of bitumen is still a recognized surfacing on slopes of 3:12 or less.
In your books: Tab the FBC roof assemblies chapter and the HVHZ roofing sections separately, since the exam loves asking which rule applies where. HVHZ product and assembly tests are the TAS protocols in the Test Protocols volume, and tile questions resolve through FBC Building 1507.3, which adopts the FRSA/TRI installation manual by reference (that manual is not on the approved list).
Part 2 of 4
What sets the wind load
Wind pressure on a roof is not one number. Where you are, how open the ground is, how tall the roof sits and which part of the roof you are on all change it.
Four inputs set the design pressure
The wind speed maps give a 3-second gust speed that varies with location and with the building's risk category. That speed is combined with the exposure category, the mean roof height and the roof zone to get design pressure. Open ground and water are a more severe exposure than suburban terrain. Taller roofs see faster wind. Essential facilities such as hospitals and shelters sit in a higher risk category and are designed for larger loads.
Wind loads peak at the edges
Roofs divide into field, perimeter, and corner zones; corner uplift is highest because of edge vortices. Approved assemblies respond with enhanced attachment — closer fastener rows, more adhesive, extra nails — in perimeter and corner zones. Coverings are designed to components-and-cladding pressures, which exceed main-frame pressures because small elements catch localized peak gusts.
Shape and openings change the uplift
A hip roof slopes up from all four eaves, so uplift is lower and more even. A gable end is a flat wall the wind pushes on like a sail, and gable ends are a common failure point. When a window or door on the windward side fails, wind pressurizes the inside and pushes up on the roof while suction pulls from above. That is why design separates enclosed from partially enclosed buildings.
In your books: Words like required, minimum or permitted mean code lookup. Go to the FBC and never answer a wind or code question from memory.
Part 3 of 4
Load path and hurricane mitigation
A roof stays on only if every link between the covering and the foundation holds. Mitigation features assume some links will be tested, and plan for water getting in if the covering is lost.
Uplift has to travel a continuous load path
The load picked up by the covering goes through the sheathing nails, the roof-to-wall straps or clips, the walls and the foundation anchorage. The chain is only as strong as its weakest link: perfect deck nailing does nothing if the truss-to-wall connection lets go. Fastener type, spacing and placement come from the tested assembly and are not the installer's choice.
Mitigation assumes the covering can be lost
A secondary water barrier (self-adhered membrane or taped deck seams) keeps the building dry if the storm strips the covering. Reroofing certain existing homes can trigger evaluation and strengthening of roof-to-wall connections with straps or clips so the whole roof structure stays anchored.
A sealed deck and a second way off the roof for water
A sealed roof deck is made by taping every sheathing joint with self-adhered flashing strips under the underlayment, or by covering the whole deck with self-adhered membrane. Where a parapet can trap water, the code requires secondary drainage separate from the primary drains: overflow scuppers or overflow drains. A scupper opening is at least 4 inches high with its inlet no more than 2 inches above the roof's low point.
Worked examples
- 1Roof covering and its fasteners
Installed to the approved assembly
- 2Deck sheathing nails
Checked and supplemented at reroof
- 3Roof-to-wall straps or clips
Where an intact roof most often separates from the building
- 4Walls
- 5Foundation anchorage
- Highest the inlet may sit above the roof's low point2 in
- Minimum opening height4 in
Part 4 of 4
Reroofing triggers
A reroof can bring more of the building up to current code. Know when the whole section is pulled in, when only the damaged part may be repaired, and what happens at the deck.
Reroofing triggers
The 25 percent rule: when repair or replacement exceeds 25% of a roof section within 12 months, the whole section is brought to current code. The law now allows repair of only the damaged part where the existing roof was built or replaced under the 2007 Florida Building Code or later. On a site-built single-family home with a wood deck, a reroof means checking the deck nailing and adding 8d ring-shank nails where it falls short.
Know these cold
The short list to have in your head on exam day. Every line is also a card in your flashcards.
- HVHZ
- Miami-Dade and Broward counties — strictest roofing rules in the state
- Product approval
- Florida Product Approval or Miami-Dade NOA; install per the approved assembly, documents on site
- Highest uplift zone
- Corners, then perimeter, then field — attachment steps up accordingly
- Secondary water barrier
- Backup layer that keeps water out after the covering blows off
- Roof-to-wall retrofit
- Straps/clips strengthening truss-to-wall connections, triggered by reroofs on certain existing homes
- Reroof permits
- Required statewide, not just in the HVHZ
- Mapped design wind speed
- A 3-second gust value that varies by location and by the building's risk category.
- Design pressure inputs
- Wind speed, exposure category, mean roof height and roof zone.
- Exposure category
- Describes terrain roughness. Open ground and water are more severe than suburban terrain.
- Components and cladding pressures
- Higher than main-frame pressures; roof coverings and their fasteners are designed to them.
- Hip vs gable
- Hip roofs see lower, more even uplift. Gable ends need extra bracing and connection attention.
- Breached opening
- Positive internal pressure adds to the suction on top and sharply raises net uplift.
- Continuous load path
- Sheathing nails, roof-to-wall connectors, walls, foundation anchorage.
- 25 percent rule
- Over 25% of a roof section repaired or replaced within 12 months: the whole section goes to current code. Roofs built to the 2007 FBC or later may have the damaged part repaired.
- Deck re-nailing at reroof
- Site-built single-family, wood deck: supplemental 8d ring-shank nails where existing attachment falls short, typically 6 in. on center.
- Field uplift test
- Measures the real resistance of an existing deck and its fasteners before a reroof is designed.
- HVHZ ballast
- Loose-laid ballasted systems are not allowed. Aggregate in a flood coat is allowed on slopes of 3:12 or less.
- Overflow scupper
- Opening at least 4 in. high; inlet not more than 2 in. above the low point of the roof.
- Sealed roof deck
- Self-adhered strips over every deck joint, or self-adhered membrane over the whole deck.
- Tile installation standard
- FBC-Building 1507.3 references the FRSA/TRI manual and the tile's Florida product approval.
Where it lives in your books
The real exam is open book. Knowing which book and which tab answer this topic is worth as much as memorizing it.
- Roofing References · 9 recommended tabsFlorida roofing is code-first: product approvals, underlayment, and attachment requirements decide questions that would be judgment calls elsewhere. Tab the FBC roofing chapter before anything else.
- Florida Building Code · 18 recommended tabsCode questions give themselves away with words like 'minimum', 'required', or 'permitted'. Go to the code — never answer a code question from memory when the book is on the desk.
- HVHZ Test Protocols · 6 recommended tabsYou will not be asked to run a test; you will be asked which protocol applies and what it proves. Tab the index of TAS numbers and read the scope paragraph of each roofing protocol.
Reading isn't learning. Retrieval is.
31 questions in this domain, each with an explanation and source.